National Program for Inspection of Non-Federal Dams. Paradise Pond Dam (MA 00754), Connecticut River Basin, Northampton, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Paradise Pond Dam (MA 00754), Connecticut River Basin, Northampton, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 122

Get Book Here

Book Description
The stone masonry gravity dam has a hydraulic height of 23 ft., and a length of 190 ft. The dam is presently in fair condition; however, there are deficiencies which if not corrected could jeopardize the safety and integrity of the structure. The major concern is undermining of the base of the dam which has left a section of the downstream face unsupported. It is small in size with a hazard potential of high. A registered professional should be hired to design repairs to pressure leaks which appear in the face of the dam. (Author).

Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1224

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. Country Club (MA 00756), Connecticut River Basin, Northampton, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Country Club (MA 00756), Connecticut River Basin, Northampton, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 89

Get Book Here

Book Description
The dam is basically comprised of 2 stone masonry vertical faced spillways. The main spillway has a length of 69 ft. and a structural height of 32 ft. The secondary spillway has a length of 30 ft. and a height of about 9 ft. The visual inspection did not disclose any findings that indicate an immediate unsafe condition. The size classification is small with a hazard potential of significant. Due to the lack of drawdown capabilities, the dam is considered in fair condition. (Author).

National Program for Inspection of Non-Federal Dams. Vistron Dam (MA 00759), Connecticut River Basin, Northampton, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Vistron Dam (MA 00759), Connecticut River Basin, Northampton, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 99

Get Book Here

Book Description
Vistron Dam, also known as Pro Brush Dam is a stone masonry gravity dam across the NMill River. The dam has a hydraulic height of 24 feet, 195 feet long, 8 feet wide at the crest with downstream face battered at approximately 1H: 12V. The spillway section of the dam is 140 feet long. The dam is founded on bedrock which is exposed at the southwesterly abutment and along the base of the dam. The dam is presently in good condition with no major problems. The main deficiency noted is the presence of trees growing near the top and out of the side of the dry laid stone retaining wall at the northeasterly abutment. Considering a 20,000 cfs inflow, from the 52 square mile drainage area, and assuming no downstream controls, the dam would be overtopped by approximately 4 feet. Spillway capacity at the top dam is 10,500 cfs which is approximately 4 feet. Spillway capacity at the top of dam is 10,500 cfs which is approximately 52 percent of the 1/2 PMF.

Government reports annual index

Government reports annual index PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 1016

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. Northampton Reservoir (Lower Dam) (MA 00520), Connecticut River Basin, Whately, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Northampton Reservoir (Lower Dam) (MA 00520), Connecticut River Basin, Whately, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 93

Get Book Here

Book Description
The dam is a 1200 ft. long, 23 ft. high earth embankment dam. The visual inspection of the dam did not disclose any immediate stability problems. It is recommended that the seepage condition below the toe of the dam be investigated and an adequate collection and monitoring system be designed.

National Program for Inspection of Non-Federal Dams. Northampton Reservoir (Upper Dam) (MA 00521), Connecticut River Basin, Whately, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Northampton Reservoir (Upper Dam) (MA 00521), Connecticut River Basin, Whately, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 94

Get Book Here

Book Description
This dam is a 940 foot long earth embankment dam with a concrete spillway. It is recommended that the areas of erosion both on the upstream and downstream faces where the abutments and embankment interface be repaired. Surface water in these areas should be redirected to prevent future erosion. The riprap on the upstream face should be extended to the dam's crest. The water exiting from the toe and core wall drains should be directed to a control channel and weir where the flow can be periodically measured. The 20-in capped pipe running beneath the dam to the downstream toe should be uncapped and extended to the lower reservoir. This will prevent the potential of a pressurized pipe (should the outlet gate be left open) from bursting and undermining the dam. Although the spillway can not discharge the test flood without overtopping the dam, the spillway capacity is comparatively large. Because of the hydrologic and safety relationships between this dam and the lower reservoir, it is necessary that future hydrologic studies concerning spillway capacities at either project should simultaneously encompass studies for both projects.

National Program for Inspection of Non-Federal Dams. Whiting Street Pond Dam (MA 00070), Connecticut River Basin, Holyoke, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Whiting Street Pond Dam (MA 00070), Connecticut River Basin, Holyoke, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 76

Get Book Here

Book Description
Whiting Street Pond Dam is an earth-buttresed stone masonry dam, 1900 feet long with a maximum height of about 19 feet. A two level stone masonry and concrete spillway is located about 70 feet from the dam's south abutment. A gatehouse and gate chamber are located at approximately the center of the dam and contain the operating mechanisms for controlling the outflows into the City's Water Supply and to the low level outlet. Discharges from the low level outlet and the spillway converge and flow into an unnamed creek before emptying into the Connecticut River. Phase I inspection and evaluation of Whiting Street Pond Dam does not indicate conditions which would constitute an immediate hazard to human life or property. Based on engineering judgement and the performance of the dam and the outlet works, the project is considered to be in fair condition. The project, however, does have a number of deficiencies which, if not remedied, have the potential for developing into hazardous conditions. The test flood, in accordance with Corps of Engineers guidelines, is the Probable Maximum Flood (PMF). The PMF yields an outflow of 8253 cfs which is greater than the maximum discharge capacity of the spillway of 215 cfs and would result in overtopping of the dam by about 1.4 feet.

National Program for Inspection of Non-Federal Dams, Ashfield Pond Dam (MA 00523), Connecticut River Basin, Ashfield, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams, Ashfield Pond Dam (MA 00523), Connecticut River Basin, Ashfield, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 77

Get Book Here

Book Description
Ashfield Pond Dam is an earth embankment about 775 feet long with a maximum height of about 15 feet. A 30 foot long, 14.5 foot high stone masonry and concrete stepped spillway is located about 110 feet from the east abutment. A rectangular concrete low level outlet, 4 feet wide and 1.7 feet high is located at the east end of the spillway. Phase I inspection and evaluation of Ashfield Pond Dam does not indicate conditions which would constitute an immediate hazard to human life or property. Based on enginnering judgment and the performance of the earth embankment and the outlet works, the project is considered to be in fair condition. The project has a number of deficiencies which, if not remedied, have the potential for developing into hazardous conditions. Selection of 1/2 PMF as the test flood, yields an outflow of 1698 cfs (assuming the low level outlet is closed), which is greater than the maximum spillway discharge capacity of 965 cfs and would result in an overtopping of the dam by about 0.43 feet.

National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 80

Get Book Here

Book Description