National Program for Inspection of Non-Federal Dams, Lower Hart Pond Dam (CT 00247), Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams, Lower Hart Pond Dam (CT 00247), Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 67

Get Book Here

Book Description
The drainage area is 2.0 square miles and the reservoir has 825 acre-feet of storage capacity. The assessment of the dam is based on a visual inspection, past operational performance and hydraulic/hydrologic computations. The dam is judged to be in FAIR condition with several areas that require attention. These areas include seepage through the dam in the vicinity of the low-level discharge pipes and wet spots along the toe of the dam, vegetation on the embankments as well as along the toe of the dam and the inoperable status of the low-level discharge pipe. The test flood outflow will not overtop the dam and will leave 0.4 feet of freeboard.

National Program for Inspection of Non-Federal Dams, Lower Hart Pond Dam (CT 00247), Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams, Lower Hart Pond Dam (CT 00247), Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 67

Get Book Here

Book Description
The drainage area is 2.0 square miles and the reservoir has 825 acre-feet of storage capacity. The assessment of the dam is based on a visual inspection, past operational performance and hydraulic/hydrologic computations. The dam is judged to be in FAIR condition with several areas that require attention. These areas include seepage through the dam in the vicinity of the low-level discharge pipes and wet spots along the toe of the dam, vegetation on the embankments as well as along the toe of the dam and the inoperable status of the low-level discharge pipe. The test flood outflow will not overtop the dam and will leave 0.4 feet of freeboard.

National Program for Inspection of Non-Federal Dams. Upper Pond Dam (CT 00433), Lower Connecticut River Basin, Haddam, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Upper Pond Dam (CT 00433), Lower Connecticut River Basin, Haddam, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 78

Get Book Here

Book Description
Upper Pond Dam is an earth embankment dam with a maximum height of 17 feet and a length of 390 feet. The dam embankment left of the spillway is approximately 10 feet in width, with 2 horizontal to 1 vertical upstream and downstream embankment slopes. The centrally located spillway is 72 feet in length and is a stone masonry structure. Stone masonry training walls approximately 5 feet in height are located at each side of the spillway. The outlet works consist of a concrete gate structure and an outlet channel. Based on the visual inspection, the Upper Pond Dam appears to be in poor condition. There was no movement or settlement of the crest observed. The horizontal alignment is good. The top of the outlet gate structure, however, is lower than the embankment crest. Some erosion was noted at the abutments, adjacent to the spillway section and adjacent to the outlet works. Trespassing on the slopes was not significant. Erosion scarps on the upstream slope extending 1-2 feet above waterline were noted. Several areas of broad shallow erosion on the upstream slope and upstream side of abutments were observed. Brush and many large trees (up to 2.5-ft.-dia.) with extensive root systems were noted on the slopes and crest of the dam. Standing water was observed in an area 35 feet downstream of the toe on the right side of the dam. The capacity of the spillway is inadequate to pass the 1/2 PMF test flood outflow of 5,195 CFS and would overtop the dam by about 0.9 feet. The spillway can pass about 33 percent of the test flood.

Government reports annual index

Government reports annual index PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 1140

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. Paper Goods Pond Dam (CT 00253), Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Paper Goods Pond Dam (CT 00253), Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 98

Get Book Here

Book Description
The Paper Goods Pond Dam is a concrete and masonry structure. It is approximately 70 feet long, 30 feet high and has an average top width of 4 feet. The Paper Goods Pond Dam was probably constructed in 1920 with subsequent improvements in 1939. The present owner and operator of the dam is Sherwood Industries, Inc., which uses the pond for industrial water supply. Based on visual inspection and past operational performance, the dam is judged to be in FAIR condition. Seepage was noted through the southwest abutment and along the southern downstream channel wall. The 10 inch supply main presently has no control at the dam. The test flood for this dam is 1/2 the Probable Maximum Flood (PMF). The test flood has an inflow equal to 6415 cfs and an outflow discharge equal to 6400 cfs with a stillwater elevation of 125.0 which will overtop the dam by 5.5 feet. The maximum outflow capacity of the spillway with the water surface at the top of the dam is 1190 cfs, which is 19 percent of the test flood outflow.

Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1112

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. Stub Pond Dam (CT 00265), Connecticut River Basin, Avon, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Stub Pond Dam (CT 00265), Connecticut River Basin, Avon, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 91

Get Book Here

Book Description
This dam consists of an earth embankment, and a concrete wall which extends from the embankments to the spillway on each end of the spillway. The earth embankment is 500 feet long, 8 feet wide at the top and 6.7 feet high, with a downstream slope of 2H:1V. The concrete spillway is located at the western end of the dam and is 40 feet long with 15 inch high permanently attached timber flashboards. Based on the visual inspection, and past operational performance, the dam is judged to be in POOR condition. There are large trees growing on the embankment. The concrete wall is severely cracked and spalled and has been exposed on the downstream side by erosion. Seepage is occurring through the wall and all along the downstream toe of the embankment. The test flood for this dam is the 100 year flood. The test flood has an inflow equal to 1810 cfs and an outflow discharge equal to 1800 cfs at a stillwater elevation of 233.1 which will overtop the dam by 1.0 foot. The maximum outflow capacity of the spillway with the water level at the top of the dam is 53 cfs, which is 3 percent of the test flood outflow.

National Program for Inspection of Non-Federal Dams. Silver Lake Dam (CT 00254), Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Silver Lake Dam (CT 00254), Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 86

Get Book Here

Book Description
The 140 foot long dam is an earth embankment, the top of which, at elevation 154.5, is approximately 15 feet above the streambed of Belcher Brook. A drop inlet at a flow line elevation about 4.5 feet below the top of the dam, is the spillway facility. A wooden gate extending the full 7.5 foot depth of the structure is the low level outlet, however it is apparently stuck in a closed position. The inlet structure feeds an arched brick culvert which has an estimated chord length of 7 feet and an effective depth of approximately 3 feet, due to heavy siltation. A recent partial collapse of the brick culvert where it abuts the downstream low-level outlet headwall caused partial blockage of the culvert as well as an approximately six foot wide cavity and sloughing to the crest of the dam on the downstream slope. Based on the visual inspection at the site and past performance, the dam is judged to be in very poor condition. Evidence of instability was noted in the form of a collapse of the outlet conduit and a subsequent failure of the downstream slope of the dam. There are other areas requiring attention as well. Based upon the hydraulics computations, the spillway capacity is 180 cfs to the top of the dam, which is equivalent to 72% of the routed test flood outflow.

National Program for Inspection of Non-Federal Dams, Kensington Dam (CT-00250), Lower Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams, Kensington Dam (CT-00250), Lower Connecticut River Basin, Berlin, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 71

Get Book Here

Book Description
The dam is a 205 foot long concrete gravity structure keyed into rock at both abutments. The top of the dam is typically 5.5 feet wide and approximately 25 feet above the bed of the Mattabesset River. The upstream face of the dam by visual inspection is vertical, while the downstream face is battered on an inclination of approximately 2 horizontal to 1 vertical based upon field measurements. The spillway is a concrete, broad crested compound weir of trapezoidal cross-section with a shallow bucket dissipator apron. The spillway crest is 3.0 feet below the top of the dam. There are two low level gates on the upstream face of the dam. One gate feeds the 42 inch cast iron low level outlet, and is operable. The other gate feeds a pipeline which was used to provide water to the downstream railroad line. This gate is inoperable and the present existence and condition of the pipeline is uncertain. There are three residential structures and a storage building located immediately downstream of the dam. Based upon the visual inspection at the site and past performance history, the dam appears to be in fair condition. No evidence of instability in the dam was observed. Downstream of the dam approximately 70 feet, the left channel wall is collapsed and at this point is in poor condition. There are some other areas requiring attention as well, in the form of minor maintenance or monitoring. Based upon our hydraulics computations, the spillway capacity is 1560 cubic feet per second (cfs), which is equivalent to 18% of the Test Flood.

National Program for Inspection of Non-Federal Dams. Bushy Hill Pond Dam (CT 00426), Lower Connecticut River Basin, Deep River, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Bushy Hill Pond Dam (CT 00426), Lower Connecticut River Basin, Deep River, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 83

Get Book Here

Book Description
Bushy Hill Pond Dam is an earth embankment structure 265 feet in length with a maximum height of 29 feet. A stone spillway 20 feet in length is located at the right abutment of the dam. The upstream face of the dam is a vertical concrete wall. The dam crest and downstream embankment are grassed. The spillway is located at the right abutment and is 20 feet in length. A 12 inch blow-off pipe provides a low level outlet. Based on the visual inspection, Bushy Hill Pond Dam and its appurtenances are judged to be in poor condition. The crest of the dam appears to dip toward the upstream face. The vertical alignment is good. The face appears to bow slightly upstream and the concrete wall is cracked at many locations. The downstream slope is uneven and erosion has occurred along the toe. Large boulders were observed at the intersection of dam and spillway training wall on the left side of the spillway. Seepage was noted along the toe of the downstream slope. The stone masonry overflow spillway section has open joints; however, no movement or seepage was observed. The spillway discharge channel is in general good condition. Some sloughing of the channel embankment (right side) was noted about 20 feet below the spillway. A 12-inch diameter low level blow-off was operated during the site visit. The test flood would overtop the dam by 1.4 feet. The spillway capacity without overtopping is 140 CFS which is about 9 percent of the test flood outflow.

National Program for Inspection of Non-Federal Dams. Rainbow Pond Dam (CT 00039), Connecticut River Basin, Windsor, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Rainbow Pond Dam (CT 00039), Connecticut River Basin, Windsor, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 102

Get Book Here

Book Description
The dam consists of a 400 foot long concrete spillway across the Farmington River with an adjacent hydroelectric generating powerhouse, and a 100 foot long butressed concrete transition dam spanning from the 70 foot long powerhouse to a 1050 foot long earth dike running along the pond shoreline. There are two low level sluices through the spillway section which are operated by hydraulic lifts in a chamber above the sluices. The sluices have an inlet elevation approximately 44.5 feet below the crest of the spillway. The 4 inlets to the turbines are approximately 34.5 feet below the crest of the spillway; the discharge flows to a tailrace channel cut into bedrock to the left of the spillway discharge channel. A fish ladder with an inlet about 1.5 feet below the spillway crest also discharges into the tailrace channel. All inlet gates are well maintained and operable. Based upon the visual inspection and past performance, the dam is judged to be in fair condition. No evidence of instability was observed in the dam or its appurtenances. The condition of the earth dike is good, however there are areas requiring attention. Based upon our hydraulics computations, the spillway capacity is 101,000 (cfs), which is equivalent to 51% of the routed Test Flood outflow.