National Ignition Facility Design, Performance, and Cost

National Ignition Facility Design, Performance, and Cost PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 12

Get Book Here

Book Description
A conceptual design for the National Ignition Facility (NIF) has been completed and its cost has been estimated by a multilaboratory team. To maximize the performance/cost ratio a compact, segmented amplifier is used in a multipass architecture. Many recent optical and laser technology developments have been incorporated into the final design. The Beamlet project has successfully demonstrated the new concept. The mission of ICF Program using the NEF is to achieve ignition and gain in the laboratory. The facility will be used for defense applications such as weapons physics and weapons effects experiments, and for civilian applications such as inertial fusion energy development and fundamental studies of matter at high energy density.

National Ignition Facility Design, Performance, and Cost

National Ignition Facility Design, Performance, and Cost PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 12

Get Book Here

Book Description
A conceptual design for the National Ignition Facility (NIF) has been completed and its cost has been estimated by a multilaboratory team. To maximize the performance/cost ratio a compact, segmented amplifier is used in a multipass architecture. Many recent optical and laser technology developments have been incorporated into the final design. The Beamlet project has successfully demonstrated the new concept. The mission of ICF Program using the NEF is to achieve ignition and gain in the laboratory. The facility will be used for defense applications such as weapons physics and weapons effects experiments, and for civilian applications such as inertial fusion energy development and fundamental studies of matter at high energy density.

Shell Catalogues

Shell Catalogues PDF Author:
Publisher:
ISBN:
Category : Mollusks
Languages : en
Pages :

Get Book Here

Book Description


Conceptual Design of the National Ignition Facility

Conceptual Design of the National Ignition Facility PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
DOE commissioned a Conceptual Design Report (CDR) for the National Ignition Facility (NIF) in January 1993 as part of a Key Decision Zero (KDO), justification of Mission Need. Motivated by the progress to date by the Inertial Confinement Fusion (ICF) program in meeting the Nova Technical Contract goals established by the National Academy of Sciences in 1989, the Secretary requested a design using a solid-state laser driver operating at the third harmonic (0.35[mu]m) of neodymium (Nd) glass. The participating ICF laboratories signed a Memorandum of Agreement in August 1993, and established a Project organization, including a technical team from the Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratories (SNL), and the Laboratory for Laser Energetics at the University of Rochester. Since then, we completed the NIF conceptual design, based on standard construction at a generic DOE Defense Program's site, and issued a 7,000-page, 27-volume CDR in May 1994.2 Over the course of the conceptual design study, several other key documents were generated, including a Facilities Requirements Document, a Conceptual Design Scope and Plan, a Target Physics Design Document, a Laser Design Cost Basis Document, a Functional Requirements Document, an Experimental Plan for Indirect Drive Ignition, and a Preliminary Hazards Analysis (PHA) Document. DOE used the PHA to categorize the NIF as a low-hazard, non-nuclear facility. On October 21, 1994 the Secretary of Energy issued a Key Decision One (KD1) for the NIF, which approved the Project and authorized DOE to request Office of Management and Budget-approval for congressional line-item FY 1996 NIF funding for preliminary engineering design and for National Environmental Policy Act activities. In addition, the Secretary declared Livermore as the preferred site for constructing the NIF. The Project will cost approximately$1.1 billion and will be completed at the end of FY 2002.

The National Ignition Facility

The National Ignition Facility PDF Author: Jim Wells
Publisher: DIANE Publishing
ISBN: 9780756705374
Category : Technology & Engineering
Languages : en
Pages : 50

Get Book Here

Book Description
The Univ. of CA, under contract to the DoE to operate Lawrence Livermore Nat. Lab., is building the Nat. Ignition Facility. DoE considers the Nat. Ignition Facility an essential component of its Stockpile Stewardship Program, which is responsible for ensuring the safety & reliability of nuclear weapons in the absence of nuclear testing. The Nat. Ignition Facility was originally expected to cost about $2 billion when complete in 2002, but DoE has increased the cost & moved the completion date to 2006. This report determines the magnitude of the Nat. Ignition Facility's cost & schedule overruns; documents the reasons for them; & assesses the effects of the Nat. Ignition Facility's cost & schedule on other weapons programs. Tables.

National Ignition Facility Subsystem Design Requirements NIF Site Improvements SSDR 1.2.1

National Ignition Facility Subsystem Design Requirements NIF Site Improvements SSDR 1.2.1 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 39

Get Book Here

Book Description
This Subsystem Design Requirements (SSDR) document establishes the performance, design, and verification requirements associated with the NIF Project Site at Lawrence Livermore National Laboratory (LLNL) at Livermore, California. It identifies generic design conditions for all NIF Project facilities, including siting requirements associated with natural phenomena, and contains specific requirements for furnishing site-related infrastructure utilities and services to the NIF Project conventional facilities and experimental hardware systems. Three candidate sites were identified as potential locations for the NIF Project. However, LLNL has been identified by DOE as the preferred site because of closely related laser experimentation underway at LLNL, the ability to use existing interrelated infrastructure, and other reasons. Selection of a site other than LLNL will entail the acquisition of site improvements and infrastructure additional to those described in this document. This SSDR addresses only the improvements associated with the NIF Project site located at LLNL, including new work and relocation or demolition of existing facilities that interfere with the construction of new facilities. If the Record of Decision for the PEIS on Stockpile Stewardship and Management were to select another site, this SSDR would be revised to reflect the characteristics of the selected site. Other facilities and infrastructure needed to support operation of the NIF, such as those listed below, are existing and available at the LLNL site, and are not included in this SSDR. Office Building. Target Receiving and Inspection. General Assembly Building. Electro- Mechanical Shop. Warehousing and General Storage. Shipping and Receiving. General Stores. Medical Facilities. Cafeteria services. Service Station and Garage. Fire Station. Security and Badging Services.

The National Ignition Facility Project

The National Ignition Facility Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 9

Get Book Here

Book Description
The Secretary of the U.S. Department of Energy (DOE) commissioned a Conceptual Design Report (CDR) for the National Ignition Facility (NIF) in January 1993 as part of a Key Decision Zero (KD0), justification of Mission Need. Motivated by the progress to date by the Inertial Confinement Fusion (ICF) program in meeting the Nova Technical Contract goals established by the National Academy of Sciences in 1989, the Secretary requested a design using a solid-state laser driver operating at the third harmonic (0.35 [mu]m) of neodymium (Nd) glass. The participating ICF laboratories signed a Memorandum of Agreement in August 1993, and established a Project organization, including a technical team from the Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratories (SNL), and the Laboratory for Laser Energetics at the University of Rochester. Since then, the authors completed the NIF conceptual design, based on standard construction at a generic DOE Defense Program`s site, and issued a 7,000-page, 27-volume CDR in May 1994. Over the course of the conceptual design study, several other key documents were generated, including a Facilities Requirements Document, a Conceptual Design Scope and Plan, a Target Physics Design Document, a Laser Design Cost Basis Document, a Functional Requirements Document, an Experimental Plan for Indirect Drive Ignition, and a Preliminary Hazards Analysis (PHA) Document. DOE used the PHA to categorize the NIF as a low-hazard, non-nuclear facility. This article presents an overview of the NIF project.

National Ignition Facility

National Ignition Facility PDF Author: United States. General Accounting Office
Publisher: DIANE Publishing
ISBN: 1428972323
Category : Nuclear facilities
Languages : en
Pages : 50

Get Book Here

Book Description


National Ignition Facility

National Ignition Facility PDF Author:
Publisher:
ISBN:
Category : Nuclear facilities
Languages : en
Pages : 52

Get Book Here

Book Description


Publications of the National Bureau of Standards

Publications of the National Bureau of Standards PDF Author: United States. National Bureau of Standards
Publisher:
ISBN:
Category : Washington (D.C.)
Languages : en
Pages : 544

Get Book Here

Book Description


NBS Special Publication

NBS Special Publication PDF Author:
Publisher:
ISBN:
Category : Weights and measures
Languages : en
Pages : 584

Get Book Here

Book Description