2019 Step Review of the Hood River Production Program

2019 Step Review of the Hood River Production Program PDF Author: United States. Independent Scientific Review Panel
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 23

Get Book Here

Book Description

2019 Step Review of the Hood River Production Program

2019 Step Review of the Hood River Production Program PDF Author: United States. Independent Scientific Review Panel
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 23

Get Book Here

Book Description


Hood River Production Program

Hood River Production Program PDF Author:
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 69

Get Book Here

Book Description


Hood River Production Program Monitoring and Evaluation

Hood River Production Program Monitoring and Evaluation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 248

Get Book Here

Book Description
The primary goals of the Hood River Production Program is to (1) increase subbasin production of wild summer and winter steelhead and (2) reintroduce spring chinook salmon into the Hood River subbasin.

Hood River Production Program Monitoring and Evaluation (M & E) - Confederated Tribes of Warm Springs

Hood River Production Program Monitoring and Evaluation (M & E) - Confederated Tribes of Warm Springs PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 64

Get Book Here

Book Description
This progress report describes work performed by the Confederated Tribes of Warm Springs (CTWSRO) portion of the Hood River Production Program Monitoring and Evaluation Project (HRPP) during the 2008 fiscal year. A total of 64,736 hatchery winter steelhead, 12,108 hatchery summer steelhead, and 68,426 hatchery spring Chinook salmon smolts were acclimated and released in the Hood River basin during the spring. The HRPP exceeded program goals for a release of and 50,000 winter steelhead but fell short of the steelhead release goals of 30,000 summer steelhead and 75,000 spring Chinook in 2008. Passive Integrated Transponders (PIT) tags were implanted in 6,652 hatchery winter steelhead, and 1,196 hatchery summer steelhead, to compare migratory attributes and survival rates of hatchery fish released into the Hood River. Water temperatures were recorded at six locations within the Hood River subbasin to monitor for compliance with Oregon Department of Environmental Quality water quality standards. A preseason spring Chinook salmon adult run forecast was generated, which predicted an abundant return adequate to meet escapement goal and brood stock needs. As a result the tribal and sport fisheries were opened. A tribal creel was conducted from May 22 to July 18 during which an estimated 172 spring Chinook were harvested. One hundred sixteen Spring Chinook salmon redds were observed and 72 carcasses were inspected on 19.4 miles of spawning grounds throughout the Hood River Basin during 2008. Annual salvage operations were completed in two irrigation canals resulting in the liberation of 1,641 fish back to the Hood River.

Hood River Production Master Plan

Hood River Production Master Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 102

Get Book Here

Book Description
The Northwest Power Planning Council's 1987 Columbia River Fish and Wildlife Program authorizes the development of artificial production facilities to raise chinook salmon and steelhead for enhancement in the Hood, Umatilla, Walla Walla, Grande Ronde and Imnaha rivers and elsewhere. On February 26, 1991 the Council agreed to disaggregate Hood River from the Northeast Oregon Hatchery Project, and instead, link the Hood River Master Plan (now the Hood River Production Plan) to the Pelton Ladder Project (Pelton Ladder Master Plan 1991).

2020 Response Review of the Hood River Production Program

2020 Response Review of the Hood River Production Program PDF Author: United States. Independent Scientific Review Panel
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 23

Get Book Here

Book Description


Hood River Production Program Monitoring and Evaluation. Report B: Hood River and Pelton Ladder; Annual Report 1996

Hood River Production Program Monitoring and Evaluation. Report B: Hood River and Pelton Ladder; Annual Report 1996 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The Hood River Production Program (HRPP) is jointly implemented by the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWS) and the Oregon Department of Fish and Wildlife (ODFW). The primary goals of the HRPP are (1) to re-establish naturally sustaining spring chinook salmon using Deschutes River stock in the Hood River subbasin, (2) rebuild naturally sustaining runs of summer and winter steelhead in the Hood River subbasin, (3) maintain the genetic characteristics of the populations, and (4) contribute to tribal and non-tribal fisheries, ocean fisheries, and the Northwest Power Planning Council's (NPPC) interim goal of doubling salmon runs.

Hood River Production Program

Hood River Production Program PDF Author:
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 69

Get Book Here

Book Description


Revised Master Plan for the Hood River Production Program, Technical Report 2008

Revised Master Plan for the Hood River Production Program, Technical Report 2008 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 428

Get Book Here

Book Description
The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP's defined smolt-to-adult (SAR) survival rate guidelines. The observed low SAR was due to precocity, straying, and incidence of BKD in the spring Chinook program; which ultimately led to the program's inability to achieve the subbasin's overly optimistic biological fish objectives. The summer steelhead hatchery program was not providing the fishery or population benefits anticipated and will be discontinued. The winter steelhead program was performing as planned and no changes are foreseen. This updated Master Plan addresses the several proposed changes to the existing HRPP, which are described.

Hood River Production Program Review, Final Report 1991-2001

Hood River Production Program Review, Final Report 1991-2001 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 501

Get Book Here

Book Description
This document provides a comprehensive review of Bonneville Power Administration (BPA) funded activities within the Hood River Basin from 1991 to 2001. These activities, known as the Hood River Production Program (HRPP), are intended to mitigate for fish losses related to operation of federal dams in the Columbia River Basin, and to contribute to recovery of endangered and/or threatened salmon and steelhead, as directed by Nation Oceanic and Atmospheric Administration - Fisheries (NOAA Fisheries). The Environmental Impact Statement (EIS) for the HRPP, which authorized BPA to fund salmon and steelhead enhancement activities in the Hood River Basin, was completed in 1996 (BPA 1996). The EIS specified seven years of monitoring and evaluation (1996-2002) after program implementation to determine if program actions needed modification to meet program objectives. The EIS also called for a program review after 2002, that review is reported here.