Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 220
Book Description
Technical Abstract Bulletin
Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 220
Book Description
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 220
Book Description
Navy Force Structure and Shipbuilding Plans
Author: Ronald O'Rourke
Publisher:
ISBN:
Category :
Languages : en
Pages : 145
Book Description
Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.
Publisher:
ISBN:
Category :
Languages : en
Pages : 145
Book Description
Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.
Results of the Ninth Annual DOD/FAI Acquisition Research Symposium
Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 82
Book Description
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 82
Book Description
Administration & Management
Author:
Publisher:
ISBN:
Category : Management
Languages : en
Pages : 290
Book Description
Publisher:
ISBN:
Category : Management
Languages : en
Pages : 290
Book Description
Analysis of the Navy¿s Shipbuilding Plans
Author: Eric J. Labs
Publisher: DIANE Publishing
ISBN: 1437982972
Category : Technology & Engineering
Languages : en
Pages : 31
Book Description
Statement of Eric J. Labs on the Navy¿s plans for its shipbuilding programs and corresponding budget. Contents: (1) Changes in Ship Requirements Under the 2011 Plan; (2) Ship Purchases and Inventories Under the 2011 Plan: Combat Ships; Logistics and Support Ships; (3) Ship Costs Under the 2011 Plan: The Navy¿s Estimates; CBO¿s Estimates; Changes from the 2009 Plan; (4) Outlook for Individual Ship Programs; Aircraft Carriers; Submarines; Large Surface Combatants; Littoral Combat Ships; Amphibious Ships. Charts and tables. This is a print on demand edition of an important, hard-to-find publication.
Publisher: DIANE Publishing
ISBN: 1437982972
Category : Technology & Engineering
Languages : en
Pages : 31
Book Description
Statement of Eric J. Labs on the Navy¿s plans for its shipbuilding programs and corresponding budget. Contents: (1) Changes in Ship Requirements Under the 2011 Plan; (2) Ship Purchases and Inventories Under the 2011 Plan: Combat Ships; Logistics and Support Ships; (3) Ship Costs Under the 2011 Plan: The Navy¿s Estimates; CBO¿s Estimates; Changes from the 2009 Plan; (4) Outlook for Individual Ship Programs; Aircraft Carriers; Submarines; Large Surface Combatants; Littoral Combat Ships; Amphibious Ships. Charts and tables. This is a print on demand edition of an important, hard-to-find publication.
Publication
Author: University of Michigan. Department of Naval Architecture and Marine Engineering
Publisher:
ISBN:
Category : Marine engineering
Languages : en
Pages : 548
Book Description
Publisher:
ISBN:
Category : Marine engineering
Languages : en
Pages : 548
Book Description
Shipbuilding Technology and Education
Author: Division on Engineering and Physical Sciences
Publisher: National Academies Press
ISBN: 030905382X
Category : Technology & Engineering
Languages : en
Pages : 161
Book Description
The U.S. shipbuilding industry now confronts grave challenges in providing essential support of national objectives. With recent emphasis on renewal of the U.S. naval fleet, followed by the defense builddown, U.S. shipbuilders have fallen far behind in commercial ship construction, and face powerful new competition from abroad. This book examines ways to reestablish the U.S. industry, to provide a technology base and R&D infrastructure sustaining both commercial and military goals. Comparing U.S. and foreign shipbuilders in four technological areas, the authors find that U.S. builders lag most severely in business process technologies, and in technologies of new products and materials. New advances in system technologies, such as simulation, are also needed, as are continuing developments in shipyard production technologies. The report identifies roles that various government agencies, academia, and, especially, industry itself must play for the U.S. shipbuilding industry to attempt a turnaround.
Publisher: National Academies Press
ISBN: 030905382X
Category : Technology & Engineering
Languages : en
Pages : 161
Book Description
The U.S. shipbuilding industry now confronts grave challenges in providing essential support of national objectives. With recent emphasis on renewal of the U.S. naval fleet, followed by the defense builddown, U.S. shipbuilders have fallen far behind in commercial ship construction, and face powerful new competition from abroad. This book examines ways to reestablish the U.S. industry, to provide a technology base and R&D infrastructure sustaining both commercial and military goals. Comparing U.S. and foreign shipbuilders in four technological areas, the authors find that U.S. builders lag most severely in business process technologies, and in technologies of new products and materials. New advances in system technologies, such as simulation, are also needed, as are continuing developments in shipyard production technologies. The report identifies roles that various government agencies, academia, and, especially, industry itself must play for the U.S. shipbuilding industry to attempt a turnaround.
An Analysis of the Navy's Fiscal Year 2011 Shipbuilding Plan
Author:
Publisher:
ISBN:
Category : Electronic government information
Languages : en
Pages : 36
Book Description
The Navy is required by law to submit a report to the Congress each year that projects the service's shipbuilding requirements, procurement plans, inventories, and costs over the coming 30 years. Since 2006, the Congressional Budget Office (CBO) has been performing an independent analysis of the Navy's latest shipbuilding plan at the request of the Subcommittee on Seapower and Expeditionary Forces of the House Armed Services Committee. This CBO report, the latest in that series, summarizes the ship requirements and purchases described in the Navy's 2011 plan and assesses their implications for the Navy's funding needs and ship inventories through 2040. The new plan appears to increase the required size of the fleet compared with earlier plans, while reducing the number of ships to be purchased, and thus the costs for ship construction, over the next three decades. Despite those reductions, the total costs of carrying out the 2011 plan would be much higher than the funding levels that the Navy has received in recent years.
Publisher:
ISBN:
Category : Electronic government information
Languages : en
Pages : 36
Book Description
The Navy is required by law to submit a report to the Congress each year that projects the service's shipbuilding requirements, procurement plans, inventories, and costs over the coming 30 years. Since 2006, the Congressional Budget Office (CBO) has been performing an independent analysis of the Navy's latest shipbuilding plan at the request of the Subcommittee on Seapower and Expeditionary Forces of the House Armed Services Committee. This CBO report, the latest in that series, summarizes the ship requirements and purchases described in the Navy's 2011 plan and assesses their implications for the Navy's funding needs and ship inventories through 2040. The new plan appears to increase the required size of the fleet compared with earlier plans, while reducing the number of ships to be purchased, and thus the costs for ship construction, over the next three decades. Despite those reductions, the total costs of carrying out the 2011 plan would be much higher than the funding levels that the Navy has received in recent years.
Navy Shipbuilding Acquisition Programs and Budget Requirements of the Navy's Shipbuilding and Construction Plan
Author: United States. Congress. House. Committee on Armed Services. Subcommittee on Seapower and Projection Forces
Publisher:
ISBN:
Category : Shipbuilding
Languages : en
Pages : 160
Book Description
Publisher:
ISBN:
Category : Shipbuilding
Languages : en
Pages : 160
Book Description
Department of Defense Appropriations for 1997
Author: United States. Congress. House. Committee on Appropriations. Subcommittee on National Security
Publisher:
ISBN:
Category : United States
Languages : en
Pages : 492
Book Description
Publisher:
ISBN:
Category : United States
Languages : en
Pages : 492
Book Description