Author: Michigan. Department of Transportation
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Draft Environmental Impact Statement and Draft Section 4(f)evaluation :.
Author: Michigan. Department of Transportation
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Draft Environmental Impact Statement and Section 4 (f) Evaluation ... State Trunk Highway 83, IH 94 to STH 16, Waukesha County, Wisconsin
Author:
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 270
Book Description
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 270
Book Description
Knik Arm Crossing, Anchorage and Matanuska-Susitna Borough, Alaska
Author: United States. Federal Highway Administration
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 469
Book Description
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 469
Book Description
Draft Environmental Impact Statement and Section 4(f) Evaluation
Author: Utah. Department of Transportation
Publisher:
ISBN:
Category : Highway planning
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Highway planning
Languages : en
Pages :
Book Description
Supplement Draft Environmental Impact Statement and Section 4(f) Evaluation
Author:
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 0
Book Description
"The I-94 East-West Corridor study area is from 70th Street to 16th Street, a distance of about 3.5 miles. This corridor has safety issues, closely spaced interchanges, a combination of left-hand and right-hand exit and entrance ramps, and deteriorated pavement. As traffic increases, safety and traffic operations on this corridor will continue to deteriorate. By 2050, increased traffic volumes will cause nearly this entire section of I-94 to operate at level of service D to F during peak periods. The Final Environmental Impact Statement (EIS) was approved in 2016. The Final EIS evaluated the social, environmental, and economic impacts of the No-build alternative and a range of Build Alternatives, as well as the extent to which these alternatives address the project’s purpose and need. WisDOT and FHWA prepared a Supplemental EIS to incorporate the most up-to-date data, updated environmental regulations, changes to the alternatives, and public and agency input since the 2016 Final EIS."-- Abstract
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 0
Book Description
"The I-94 East-West Corridor study area is from 70th Street to 16th Street, a distance of about 3.5 miles. This corridor has safety issues, closely spaced interchanges, a combination of left-hand and right-hand exit and entrance ramps, and deteriorated pavement. As traffic increases, safety and traffic operations on this corridor will continue to deteriorate. By 2050, increased traffic volumes will cause nearly this entire section of I-94 to operate at level of service D to F during peak periods. The Final Environmental Impact Statement (EIS) was approved in 2016. The Final EIS evaluated the social, environmental, and economic impacts of the No-build alternative and a range of Build Alternatives, as well as the extent to which these alternatives address the project’s purpose and need. WisDOT and FHWA prepared a Supplemental EIS to incorporate the most up-to-date data, updated environmental regulations, changes to the alternatives, and public and agency input since the 2016 Final EIS."-- Abstract
Draft Environmental Impact Statement/report and Draft Section 4(f) Evaluation
Author: California. Department of Transportation
Publisher:
ISBN:
Category : Alameda County (Calif.)
Languages : en
Pages :
Book Description
Caltrans proposes to relieve traffic congestion on I-880 and improve access between the State Route 238/Mission Boulevard corridor and I-880 in the Fremont and Union City area by evaluating alternative travel routes within Southern Alameda County. Alternatives include a no-build alternative, a transportation system management alternative and four alignment alternatives.
Publisher:
ISBN:
Category : Alameda County (Calif.)
Languages : en
Pages :
Book Description
Caltrans proposes to relieve traffic congestion on I-880 and improve access between the State Route 238/Mission Boulevard corridor and I-880 in the Fremont and Union City area by evaluating alternative travel routes within Southern Alameda County. Alternatives include a no-build alternative, a transportation system management alternative and four alignment alternatives.
Draft Environmental Impact Statement/Section 4(f) Evaluation
Author: Ohio. Department of Transportation. Bureau of Environmental Services
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 380
Book Description
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 380
Book Description
Draft Environmental Impact Statement and Draft Section 4(f) Evaluation US 2, Havre to Fort Belknap
Author: United States. Department of Transportation
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Draft Environmental Impact Statement and Draft Section 4(f) Evaluation for Phalen Boulevard
Author: Saint Paul (Minn.). Department of Planning and Economic Development
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Final Environmental Impact Statement/section 4 (f) and 106/4 (f) Evaluation
Author:
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 242
Book Description
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 242
Book Description