Clinton US 30/67 Corridor Study

Clinton US 30/67 Corridor Study PDF Author: Howard R. Green Company
Publisher:
ISBN:
Category : Highway planning
Languages : en
Pages :

Get Book Here

Book Description
Howard R. Green Company was retained to complete a corridor study for the US 30/67 Corridor within the City of Clinton from the west intersection of US 30 and US 67 to the intersection of Camanche Avenue and 4th Street. The initial phase of the project was constructed. The second phase, which extends from 14th Street to 4th Street, is currently being designed. This phase includes completion of a travel demand model to forecast future traffic volumes for the corridor and a traffic operations analysis of select alternatives. Traffic forecasts for 2030 were developed using a computer model and validation procedures consistent with recognized transportation planning guidelines. A base year model was created using roadway attribute data from the Iowa Department of Transportation, and socioeconomic data (1990 and 2000 Census data) from the East Central Intergovernmental Association (ECIA). The model network was altered to represent Year 2030 conditions with the addition of programmed and committed projects. Socioeconomic data was estimated by ECIA using historical growth information. Considering future development plans, the City of Clinton Planning Department assigned the future employment and household projections to each travel analysis zone. Year 2030 PM peak turning movement volumes were developed for the preferred design alternative which consists of a one-way couplet utilizing Camanche Avenue for westbound traffic and Liberty Avenue for eastbound traffic from 14th Street to 4th Street. The volumes were entered into a simulation model in order to complete an operations analysis to determine appropriate signal locations and level of service of roadways and intersections for the study area. The approach to the traffic operation analysis is derived from the established methodologies documented in the Highway Capacity Manual. The one-way pair alternative was analyzed assuming three lanes in each direction and a posted speed of 35 miles per hour on each roadway. For this design, signals should be placed at the intersections of Camanche Avenue and 14th Street, Camanche Avenue and 5th Street, Liberty Avenue and 5th Street, and Camanche Avenue and 4th Street at a minimum. With this configuration, signalized intersections will operate at level of service A and B, and thru-stop intersections will operate at level of service A. Camanche Avenue will operate will operate at level of service A, and Liberty Avenue will operate at the level of service A/B boundary. Additional signals may be placed at select locations experiencing high delay on the minor street. These locations include the intersections of Camanche Avenue with 23rd Place and 15th Avenue as well as the intersections of Liberty Avenue with 23rd Place and 15th Avenue. This placement will cause slight reductions of the overall level of service of the corridor, but should still be considered during reconstruction of the corridor.

Clinton US 30/67 Corridor Study

Clinton US 30/67 Corridor Study PDF Author: Howard R. Green Company
Publisher:
ISBN:
Category : Highway planning
Languages : en
Pages :

Get Book Here

Book Description
Howard R. Green Company was retained to complete a corridor study for the US 30/67 Corridor within the City of Clinton from the west intersection of US 30 and US 67 to the intersection of Camanche Avenue and 4th Street. The initial phase of the project was constructed. The second phase, which extends from 14th Street to 4th Street, is currently being designed. This phase includes completion of a travel demand model to forecast future traffic volumes for the corridor and a traffic operations analysis of select alternatives. Traffic forecasts for 2030 were developed using a computer model and validation procedures consistent with recognized transportation planning guidelines. A base year model was created using roadway attribute data from the Iowa Department of Transportation, and socioeconomic data (1990 and 2000 Census data) from the East Central Intergovernmental Association (ECIA). The model network was altered to represent Year 2030 conditions with the addition of programmed and committed projects. Socioeconomic data was estimated by ECIA using historical growth information. Considering future development plans, the City of Clinton Planning Department assigned the future employment and household projections to each travel analysis zone. Year 2030 PM peak turning movement volumes were developed for the preferred design alternative which consists of a one-way couplet utilizing Camanche Avenue for westbound traffic and Liberty Avenue for eastbound traffic from 14th Street to 4th Street. The volumes were entered into a simulation model in order to complete an operations analysis to determine appropriate signal locations and level of service of roadways and intersections for the study area. The approach to the traffic operation analysis is derived from the established methodologies documented in the Highway Capacity Manual. The one-way pair alternative was analyzed assuming three lanes in each direction and a posted speed of 35 miles per hour on each roadway. For this design, signals should be placed at the intersections of Camanche Avenue and 14th Street, Camanche Avenue and 5th Street, Liberty Avenue and 5th Street, and Camanche Avenue and 4th Street at a minimum. With this configuration, signalized intersections will operate at level of service A and B, and thru-stop intersections will operate at level of service A. Camanche Avenue will operate will operate at level of service A, and Liberty Avenue will operate at the level of service A/B boundary. Additional signals may be placed at select locations experiencing high delay on the minor street. These locations include the intersections of Camanche Avenue with 23rd Place and 15th Avenue as well as the intersections of Liberty Avenue with 23rd Place and 15th Avenue. This placement will cause slight reductions of the overall level of service of the corridor, but should still be considered during reconstruction of the corridor.

US-67 Clinton Bypass, US-30 to North Stockwell Lane, Clinton County, EA-FONSI.

US-67 Clinton Bypass, US-30 to North Stockwell Lane, Clinton County, EA-FONSI. PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 106

Get Book Here

Book Description


Improvements of U.S. 30/67 Phase 2 - South 14th to South 4th Street, City of Clinton, Clinton County, Iowa

Improvements of U.S. 30/67 Phase 2 - South 14th to South 4th Street, City of Clinton, Clinton County, Iowa PDF Author: Clinton (Iowa)
Publisher:
ISBN:
Category : Highway planning
Languages : en
Pages :

Get Book Here

Book Description
The action discussed in this document involves proposed improvements to U.S. Highway 30/67 beginning at South 14th Street and extending northeast to South 4th Street along Camanche Avenue and Liberty Avenue in the City of Clinton, Iowa. Initial planning for the proposed action began in 1992 when the needs for improvements were identified in a corridor study of the project area. The recommended improvements were intended as a means to reduce accident potential, improve access, and increase safety aspects of the segment including pedestrian safety. As planning for this improvement continued, the City of Clinton and Iowa Department of Transportation adopted it as a high priority project.

U.S. 67 Bypass of Clinton from U.S. 30 to North Stockwell Lane, Clinton County, Project No. F-67-2

U.S. 67 Bypass of Clinton from U.S. 30 to North Stockwell Lane, Clinton County, Project No. F-67-2 PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 104

Get Book Here

Book Description


US-67 Relocation, Clinton, EA.

US-67 Relocation, Clinton, EA. PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 104

Get Book Here

Book Description


U.S. 67 Bypass of Clinton from U.S. 30 to North Stockwell Lane, Clinton County, Project No. F-67-2

U.S. 67 Bypass of Clinton from U.S. 30 to North Stockwell Lane, Clinton County, Project No. F-67-2 PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 104

Get Book Here

Book Description


Making Further Continuing Appropriations for the Fiscal Year 2003, and for Other Purposes

Making Further Continuing Appropriations for the Fiscal Year 2003, and for Other Purposes PDF Author: United States. Congress
Publisher: Report / 108th Congress, 1st S
ISBN:
Category : Business & Economics
Languages : en
Pages : 1512

Get Book Here

Book Description
House Report 108-10. Also known as: Consolidated Appropriations Resolution, 2003. 108th Congress, 1st Session.

Access Management Awareness Program

Access Management Awareness Program PDF Author: T. H. Maze
Publisher:
ISBN:
Category : Driveways
Languages : en
Pages : 166

Get Book Here

Book Description
This report presents the results of a number of detailed Iowa access management case studies. Case studies were selected to provide a cross-section of locations and community sizes in Iowa as well as a variety of project types. Generally, access management projects completed during the mid-1990s were chosen as case studies. Projects ranging from driveway consolidation to full raised medians were analyzed on a before and after basis in terms of traffic safety, traffic operations, and adjacent business vitality. Sources of information used for the case study analysis included: road project files; traffic accident records; state sales tax records; and personal interviews of business owners, business customers, and local officials. The case study results from Iowa essentially confirm results of previous access management research from around the nation. Recent access in Iowa had significant, positive impacts in terms of traffic safety. The average reduction of annual accidents and accident rates on improved roadways was approximately 40%. Improvements in access management also led to significantly better roadway operations for most case studies. Although a small number of individual businesses do report sales losses and/or customer complaints once projects have been completed, access management projects in Iowa have not had an adverse impact on the majority of businesses located along them. In fact, some access management projects in Iowa seem to have contributed to an improved business environment along the corridors that have been improved. The results from the Iowa case studies presented in this report will be used to develop access management education materials for Iowa transportation professionals and other audiences interested in the impacts of access management.

US-67 Clinton bypass, US-30 to North Stockwell Lane, Clinton County, EA-FONSI

US-67 Clinton bypass, US-30 to North Stockwell Lane, Clinton County, EA-FONSI PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description


Making Appropriations for Agriculture, Rural Development, Food and Drug Administration, and Related Agencies for the Fiscal Year Ending September 30, 2004, and for Other Purposes

Making Appropriations for Agriculture, Rural Development, Food and Drug Administration, and Related Agencies for the Fiscal Year Ending September 30, 2004, and for Other Purposes PDF Author: United States. Congress
Publisher:
ISBN:
Category : Electronic government information
Languages : en
Pages : 1188

Get Book Here

Book Description