Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2.5 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2.5 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723417474
Category :
Languages : en
Pages : 28

Get Book Here

Book Description
Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking final action to disapprove the portion of Georgia's October 21, 2009, submission which was intended to meet the requirement to address interstate transport for the 2006 24-hour fine particulate matter (PM 2.5) national ambient air quality standards (NAAQS). Additionally, EPA is responding to comments received on EPA's January 26, 2011, proposed disapproval of the aforementioned portion of Georgia's October 21, 2009, submission. On October 21, 2009, the State of Georgia, through the Georgia Environmental Protection Division (GA EPD), provided a letter to EPA certifying that the Georgia state implementation plan (SIP) meets the interstate transport requirements with regard to the 2006 24-hour PM 2.5 NAAQS. Specifically, the interstate transport requirements under the Clean Air Act (CAA or Act) prohibit a state's emissions from significantly contributing to nonattainment or interfering with the maintenance of the NAAQS in any other state. The effect of today's action will be the promulgation of a Federal Implementation Plan (FIP) for Georgia no later than two years from the date of disapproval. The proposed Transport Rule, when final, is the FIP that EPA intends to implement for Georgia. This book contains: - The complete text of the Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2.5 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2.5 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723417474
Category :
Languages : en
Pages : 28

Get Book Here

Book Description
Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking final action to disapprove the portion of Georgia's October 21, 2009, submission which was intended to meet the requirement to address interstate transport for the 2006 24-hour fine particulate matter (PM 2.5) national ambient air quality standards (NAAQS). Additionally, EPA is responding to comments received on EPA's January 26, 2011, proposed disapproval of the aforementioned portion of Georgia's October 21, 2009, submission. On October 21, 2009, the State of Georgia, through the Georgia Environmental Protection Division (GA EPD), provided a letter to EPA certifying that the Georgia state implementation plan (SIP) meets the interstate transport requirements with regard to the 2006 24-hour PM 2.5 NAAQS. Specifically, the interstate transport requirements under the Clean Air Act (CAA or Act) prohibit a state's emissions from significantly contributing to nonattainment or interfering with the maintenance of the NAAQS in any other state. The effect of today's action will be the promulgation of a Federal Implementation Plan (FIP) for Georgia no later than two years from the date of disapproval. The proposed Transport Rule, when final, is the FIP that EPA intends to implement for Georgia. This book contains: - The complete text of the Approvals and Promulgations of Air Quality Implementation Plans - Georgia - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Approvals and Promulgations of Air Quality Implementation Plans - Alabama - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2.5 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Approvals and Promulgations of Air Quality Implementation Plans - Alabama - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2.5 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723416293
Category :
Languages : en
Pages : 26

Get Book Here

Book Description
Approvals and Promulgations of Air Quality Implementation Plans - Alabama - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Approvals and Promulgations of Air Quality Implementation Plans - Alabama - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking final action to disapprove the portion of Alabama's September 23, 2009, submission which was intended to meet the requirement to address interstate transport for the 2006 24-hour fine particulate matter (PM 2.5) national ambient air quality standards (NAAQS). Additionally, EPA is responding to comments received on EPA's January 26, 2011, proposed disapproval of the aforementioned portion of Alabama's September 23, 2009, submission. On September 23, 2009, the State of Alabama, through the Alabama Department of Environmental Management (ADEM), provided a letter to EPA certifying that the Alabama state implementation plan (SIP) meets the interstate transport requirements with regard to the 2006 24-hour PM 2.5 NAAQS. Specifically, the interstate transport requirements under the Clean Air Act (CAA or Act) prohibit a state's emissions from significantly contributing to nonattainment or interfering with the maintenance of the NAAQS in any other state. The effect of today's action will be the promulgation of a Federal Implementation Plan (FIP) for Alabama no later than two years from the date of disapproval. The proposed Transport Rule, when final, is the FIP that EPA intends to implement for Alabama. This book contains: - The complete text of the Approvals and Promulgations of Air Quality Implementation Plans - Alabama - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Approvals and Promulgations of Air Quality Implementation Plans - Kentucky - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2.5 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Approvals and Promulgations of Air Quality Implementation Plans - Kentucky - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2.5 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723417757
Category :
Languages : en
Pages : 26

Get Book Here

Book Description
Approvals and Promulgations of Air Quality Implementation Plans - Kentucky - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Approvals and Promulgations of Air Quality Implementation Plans - Kentucky - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking final action to disapprove the portion of Kentucky's September 8, 2009, submission which was intended to meet the requirement to address interstate transport for the 2006 24-hour fine particulate matter (PM 2.5) national ambient air quality standards (NAAQS). Additionally, EPA is responding to comments received on EPA's January 26, 2011, proposed disapproval of the aforementioned portion of Kentucky's September 8, 2009, submission. On September 8, 2009, the Commonwealth of Kentucky, through the Kentucky Division for Air Quality (KDAQ), provided a letter to EPA with certification that Kentucky's state implementation plan (SIP) meets the interstate transport requirements with regard to the 2006 24-hour PM 2.5 NAAQS. Specifically, the interstate transport requirements under the Clean Air Act (CAA or Act) prohibit a state's emissions from significantly contributing to nonattainment or interfering with the maintenance of the NAAQS in any other state. The effect of today's action will be the promulgation of a Federal Implementation Plan (FIP) for Kentucky no later than two years from the date of disapproval. The proposed Transport Rule, when final, is the FIP that EPA intends to implement for Kentucky. This book contains: - The complete text of the Approvals and Promulgations of Air Quality Implementation Plans - Kentucky - Disapproval of Interstate Transport Submission for 2006 24-hour PM2.5 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Approvals and Promulgations of Air Quality Implementation Plans - North Carolina - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Approvals and Promulgations of Air Quality Implementation Plans - North Carolina - Disapproval of Interstate Transport Submission for 2006 24-Hour Pm2 (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723418631
Category :
Languages : en
Pages : 26

Get Book Here

Book Description
Approvals and Promulgations of Air Quality Implementation Plans - North Carolina - Disapproval of Interstate Transport Submission for 2006 24-hour PM2 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Approvals and Promulgations of Air Quality Implementation Plans - North Carolina - Disapproval of Interstate Transport Submission for 2006 24-hour PM2 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking final action to disapprove the portion of North Carolina's September 21, 2009, submission which was intended to meet the requirement to address interstate transport for the 2006 24-hour fine particulate matter (PM 2.5) national ambient air quality standards (NAAQS). Additionally, EPA is responding to comments received on EPA's January 26, 2011, proposed disapproval of the aforementioned portion of North Carolina's September 21, 2009, submission. On September 21, 2009, the State of North Carolina, through the North Carolina Department of Environment and Natural Resources (NC DENR), provided a letter to EPA certifying that North Carolina's state implementation plan (SIP) meets the interstate transport requirements with regard to the 2006 24-hour PM 2.5 NAAQS. Specifically, the interstate transport requirements under the Clean Air Act (CAA or Act) prohibit a state's emissions from significantly contributing to nonattainment or interfering with the maintenance of the NAAQS in any other state. The effect of today's action will be the promulgation of a Federal Implementation Plan (FIP) for North Carolina no later than two years from the date of disapproval. The proposed Transport Rule, when final, is the FIP that EPA intends to implement for North Carolina. This book contains: - The complete text of the Approvals and Promulgations of Air Quality Implementation Plans - North Carolina - Disapproval of Interstate Transport Submission for 2006 24-hour PM2 (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Air Quality State Implementation Plans - Approvals and Promulgations - Wyoming - Interstate Transport (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Air Quality State Implementation Plans - Approvals and Promulgations - Wyoming - Interstate Transport (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723369100
Category :
Languages : en
Pages : 28

Get Book Here

Book Description
Air Quality State Implementation Plans - Approvals and Promulgations - Wyoming - Interstate Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Wyoming - Interstate Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is taking final action on portions of six submissions from the state of Wyoming that are intended to demonstrate that the State Implementation Plan (SIP) meets certain interstate transport requirements of the Clean Air Act (Act or CAA). These submissions address the 2006 and 2012 fine particulate matter (PM 2.5) National Ambient Air Quality Standards (NAAQS), 2008 ozone NAAQS, 2008 lead (Pb) NAAQS, 2010 sulfur dioxide (SO 2) NAAQS and 2010 nitrogen dioxide (NO 2) NAAQS. The interstate transport requirements under the CAA consist of four elements (or prongs): Significant contribution to nonattainment (prong 1) and interference with maintenance (prong 2) of the NAAQS in other states; and interference with measures required to be included in the plan for other states to prevent significant deterioration of air quality (prong 3) or to protect visibility (prong 4). Specifically, the EPA is approving Wyoming's submissions for interstate transport prongs 1 and 2 for the 2008 Pb and 2010 NO 2 NAAQS, and approving prong 1 and disapproving prong 2 for the 2008 ozone NAAQS. The EPA is also approving interstate transport prong 4 for the 2008 Pb and 2010 SO 2 NAAQS, and disapproving prong 4 for the 2006 PM 2.5, 2008 ozone, 2010 NO 2 and 2012 PM 2.5 NAAQS. This book contains: - The complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Wyoming - Interstate Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Tx187.086 Air Quality State Implementation Plans - Approval and Promulgation - State of Texas - Regional Haze and Interstate Visibility Transport (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Tx187.086 Air Quality State Implementation Plans - Approval and Promulgation - State of Texas - Regional Haze and Interstate Visibility Transport (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781727059106
Category :
Languages : en
Pages : 120

Get Book Here

Book Description
TX187.086 Air Quality State Implementation Plans - Approval and Promulgation - State of Texas - Regional Haze and Interstate Visibility Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the TX187.086 Air Quality State Implementation Plans - Approval and Promulgation - State of Texas - Regional Haze and Interstate Visibility Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 Pursuant to the Federal Clean Air Act (CAA or Act), the Environmental Protection Agency (EPA) is finalizing a partial approval of the 2009 Texas Regional Haze State Implementation Plan (SIP) submission and a Federal Implementation Plan (FIP) for Texas to address certain outstanding requirements. Specifically, the EPA is finalizing determinations regarding best available retrofit technology (BART) for electric generating units (EGUs) in the State of Texas. To address the BART requirement for sulfur dioxide (SO 2), the EPA is finalizing an alternative to BART that consists of an intrastate trading program addressing the SO 2 emissions from certain EGUs. To address the BART requirement for oxides of nitrogen (NO X), we are finalizing our proposed determination that Texas' participation in the Cross-State Air Pollution Rule's (CSAPR) trading program for ozone-season NO X qualifies as an alternative to BART. We are approving Texas' determination that its EGUs are not subject to BART for particulate matter (PM). Finally, we are disapproving portions of several SIP revisions submitted to satisfy the CAA requirement to address interstate visibility transport for six national ambient air quality standards (NAAQS): 1997 8-hour ozone, 1997 fine particulate matter (PM 2.5) (annual and 24-hour), 2006 PM 2.5 (24-hour), 2008 8-hour ozone, 2010 1-hour nitrogen dioxide (NO 2) and 2010 1-hour SO 2. We are finding that the BART alternatives to address SO 2 and NO X BART at Texas' EGUs meet the interstate visibility transport requirements for these NAAQS. This book contains: - The complete text of the TX187.086 Air Quality State Implementation Plans - Approval and Promulgation - State of Texas - Regional Haze and Interstate Visibility Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

State Air Quality Implementation Plans - Approvals and Promulgations - Atlanta, Georgia 1997 8-Hour Ozone Nonattainment Area (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

State Air Quality Implementation Plans - Approvals and Promulgations - Atlanta, Georgia 1997 8-Hour Ozone Nonattainment Area (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781726490603
Category :
Languages : en
Pages : 30

Get Book Here

Book Description
State Air Quality Implementation Plans - Approvals and Promulgations - Atlanta, Georgia 1997 8-Hour Ozone Nonattainment Area (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the State Air Quality Implementation Plans - Approvals and Promulgations - Atlanta, Georgia 1997 8-Hour Ozone Nonattainment Area (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking direct final action to approve a state implementation plan (SIP) revision, submitted by the State of Georgia, through the Georgia Environmental Protection Division (GA EPD), on October 21, 2009, to address the reasonable further progress (RFP) plan requirements for the Atlanta, Georgia 1997 8-hour ozone national ambient air quality standards (NAAQS) nonattainment area. The Atlanta, Georgia 1997 8-hour ozone nonattainment area (hereafter referred to as the "Atlanta Area" or "the Area") is comprised of Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, Dekalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in Georgia. EPA is also finding adequate the motor vehicle emissions budgets (MVEB) for volatile organic compounds (VOC) and nitrogen oxides (NOx) that were included in Georgia's RFP plan. Further, EPA is approving these MVEB. Additionally, as an administrative update EPA is also removing the numbering system from the non-regulatory provisions in the Code of Federal Regulations. This book contains: - The complete text of the State Air Quality Implementation Plans - Approvals and Promulgations - Atlanta, Georgia 1997 8-Hour Ozone Nonattainment Area (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Air Quality State Implementation Plans, Approvals and Promulgations - Georgia - Redesignation of the Atlanta 1997 8-Hour Ozone Moderate Nonattainment (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Air Quality State Implementation Plans, Approvals and Promulgations - Georgia - Redesignation of the Atlanta 1997 8-Hour Ozone Moderate Nonattainment (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723370083
Category :
Languages : en
Pages : 36

Get Book Here

Book Description
Air Quality State Implementation Plans, Approvals and Promulgations - Georgia - Redesignation of the Atlanta 1997 8-Hour Ozone Moderate Nonattainment (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans, Approvals and Promulgations - Georgia - Redesignation of the Atlanta 1997 8-Hour Ozone Moderate Nonattainment (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 EPA is taking final action to approve a request submitted on April 4, 2012, from the State of Georgia, through the Georgia Environmental Protection Division (GA EPD), to redesignate the Atlanta, Georgia, ozone nonattainment area (hereafter referred to as the "Atlanta Area," or "Area") to attainment for the 1997 8-hour ozone National Ambient Air Quality Standards (NAAQS). The Atlanta Area consists of Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties. EPA's approval of the redesignation request is based on the determination that Georgia has met the criteria for redesignation to attainment set forth in the Clean Air Act (CAA or Act). Additionally, EPA is approving, as a revision to the Georgia State Implementation Plan (SIP) a maintenance plan for the 1997 8-hour ozone standard for the Atlanta Area, including new 2024 motor vehicle emission budgets (MVEBs) for nitrogen oxides (NO X) and volatile organic compounds (VOC). In this final notice, EPA also responds to comments received on EPA's February 4, 2013, proposed rulemaking. This book contains: - The complete text of the Air Quality State Implementation Plans, Approvals and Promulgations - Georgia - Redesignation of the Atlanta 1997 8-Hour Ozone Moderate Nonattainment (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze and Interstate Visibility Transport (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze and Interstate Visibility Transport (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723349904
Category :
Languages : en
Pages : 166

Get Book Here

Book Description
Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze and Interstate Visibility Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze and Interstate Visibility Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 This final action promulgates a Federal Implementation Plan (FIP) addressing the requirements of the Regional Haze Rule (RHR) and interstate visibility transport for the disapproved portions of Arizona's Regional Haze (RH) State Implementation Plan (SIP) as described in a final rule published in the Federal Register on July 30, 2013. In that action, we partially approved and partially disapproved the State's plan to implement the regional haze program for the first planning period. This final action includes our responses to comments on our proposed FIP published in the Federal Register on February 18, 2014. This final rule, together with a final rule published in the Federal Register on December 5, 2012, completes our FIP for the disapproved portions of Arizona's RH SIP. This final rule addresses the RHR's requirements for Best Available Retrofit Technology (BART), Reasonable Progress (RP), and a Long-term Strategy (LTS) as well as the interstate visibility transport requirements of the Clean Air Act (CAA) for pollutants that affect visibility in Arizona's 12 Class I areas and areas in nearby states. The BART sources addressed in this final FIP are Tucson Electric Power (TEP) Sundt Generating Station Unit 4, Lhoist North America (LNA) Nelson Lime Plant Kilns 1 and 2, ASARCO Incorporated Hayden Smelter, and Freeport-McMoRan Incorporated (FMMI) Miami Smelter. The reasonable progress sources addressed in the FIP are Phoenix Cement Company (PCC) Clarkdale Plant Kiln 4 and CalPortland Cement (CPC) Rillito Plant Kiln 4. EPA is prepared to work with the State on a SIP revision that would replace some or all elements of the FIP. This book contains: - The complete text of the Air Quality State Implementation Plans - Approvals and Promulgations - Arizona - Regional Haze and Interstate Visibility Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section

Air Quality State Implementation Plans - Approval and Promulgation - State of Arkansas - Regional Haze and Interstate Visibility Transport (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition)

Air Quality State Implementation Plans - Approval and Promulgation - State of Arkansas - Regional Haze and Interstate Visibility Transport (Us Environmental Protection Agency Regulation) (Epa) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781723347986
Category :
Languages : en
Pages : 170

Get Book Here

Book Description
Air Quality State Implementation Plans - Approval and Promulgation - State of Arkansas - Regional Haze and Interstate Visibility Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) The Law Library presents the complete text of the Air Quality State Implementation Plans - Approval and Promulgation - State of Arkansas - Regional Haze and Interstate Visibility Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition). Updated as of May 29, 2018 The Environmental Protection Agency (EPA) is promulgating a final Federal Implementation Plan (FIP) addressing the requirements of the Regional Haze Rule and interstate visibility transport for the portions of Arkansas' Regional Haze State Implementation Plan (SIP) that EPA disapproved in a final rule published in the Federal Register on March 12, 2012. In that action, we partially approved and partially disapproved the State's plan to implement the regional haze program for the first planning period. This final rule addresses the Regional Haze Rule's requirements for Best Available Retrofit Technology (BART), reasonable progress, and a long-term strategy (LTS), as well as the requirements of the Clean Air Act (CAA or Act) regarding interference with other states' programs for visibility protection (interstate visibility transport) triggered by the issuance of the 1997 ozone National Ambient Air Quality Standards (NAAQS) and the 1997 fine particulate matter (PM 2.5) NAAQS. The FIP includes sulfur dioxide (SO 2), nitrogen oxide (NO X), and particulate matter (PM) emission limits for nine units located at six facilities to address BART requirements (these limits also satisfy reasonable progress requirements for these sources); and SO 2 and NO X emission limits for two units located at one power plant to address the reasonable progress requirements. We also provide reasonable progress goals (RPGs) for Arkansas' Class I areas. We are prepared to work with the State on a SIP revision that would replace some or all elements of the FIP. This book contains: - The complete text of the Air Quality State Implementation Plans - Approval and Promulgation - State of Arkansas - Regional Haze and Interstate Visibility Transport (US Environmental Protection Agency Regulation) (EPA) (2018 Edition) - A table of contents with the page number of each section