Appended Quality Assurance Project Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFl/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot

Appended Quality Assurance Project Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFl/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 62

Get Book Here

Book Description
Metcalf & Eddy, Inc. (M & E) under contract to the United States Army Toxic and Hazardous Materials Agency (USATHAMA), contract number DAA15-90-0016, Task Order Number 4 has appended the plans prepared for the RFI/CMS base closure at the Lexington-Blue Grass Army Depot, Kentucky. This document is one of these appendices -- the appendix to the Quality Assurance Project Plan. The appended document, Task Order 1, Quality Assurance Project Plan (QAPP), Lexington-Blue Grass Army Depot, Kentucky (USATHAMA, 1991) is henceforth called the 'original document' USEPA review comments of July 31, 1991, on the original document were incorporated into this appended document unless the comment requested work outside the task order #4 scope of work. Work outside the scope will be conducted at a later date, as deemed necessary by the COR.

Appended Quality Assurance Project Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFl/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot

Appended Quality Assurance Project Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFl/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 62

Get Book Here

Book Description
Metcalf & Eddy, Inc. (M & E) under contract to the United States Army Toxic and Hazardous Materials Agency (USATHAMA), contract number DAA15-90-0016, Task Order Number 4 has appended the plans prepared for the RFI/CMS base closure at the Lexington-Blue Grass Army Depot, Kentucky. This document is one of these appendices -- the appendix to the Quality Assurance Project Plan. The appended document, Task Order 1, Quality Assurance Project Plan (QAPP), Lexington-Blue Grass Army Depot, Kentucky (USATHAMA, 1991) is henceforth called the 'original document' USEPA review comments of July 31, 1991, on the original document were incorporated into this appended document unless the comment requested work outside the task order #4 scope of work. Work outside the scope will be conducted at a later date, as deemed necessary by the COR.

Appended Technical Plan, Appended Field Sampling Plan, Appended Health and Safety Plan, Appended Quality Assurance Project Plan for the RCRA Facility Investigation/Corrective Measures Study (RFI/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot

Appended Technical Plan, Appended Field Sampling Plan, Appended Health and Safety Plan, Appended Quality Assurance Project Plan for the RCRA Facility Investigation/Corrective Measures Study (RFI/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 56

Get Book Here

Book Description
Metcalf & Eddy, Inc. (M & E) under contract with- the United States Army Toxic and Hazardous Materials Agency (USATHAMA), contract number DAAAl5-9O-D-0016 Task Order Number 4, has appended the Technical Plan for the RFL/CMS for base closure at the Lexington-Blue Grass Army Depot, Kentucky. The appendix describes comments, addenda, corrections and clarifications to, Task Order 1, Technical Plan, Lexington-Blue Grass Army Depot, Kentucky (USATHAMA, 1991) henceforth called the 'original document' USEPA review comments of July 31, 1991, on the original document, have been incorporated into this appendix unless the comment suggested work outside the contracted scope of work for Task Order 4. Work outside the contracted scope will be conducted at a later date, as deemed necessary by the COR.

Appended Health and Safety Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFI/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot

Appended Health and Safety Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFI/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 9

Get Book Here

Book Description
Metcalf & Eddy, Inc. (M & E), under contract to the United States Army Toxic and Hazardous Materials Agency (USATHAMA), contract number DAAA15-90-D-0016, Task Order number 4, has appended the plans prepared for the RFI/CMS base closure at Lexington-Blue Grass Army Depot, Kentucky. This document is one of these appendices -- the appendix to the Health and Safety Plan. The appended document Task Order 1, Health and Safety Plan Lexington-Blue Grass Army Depot, Kentucky (USATHAMA, 1991) is henceforth called the 'original document'. USEPA review comments of July 31, 1991, on the original document were incorporated into this appended document unless the comment requested work outside the Task Order #4 scope of work. Work outside the scope will be conducted at a later date, as deemed necessary by the COR.

Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 496

Get Book Here

Book Description


Standard Guidance for the Preparation of Quality Assurance Project Plans

Standard Guidance for the Preparation of Quality Assurance Project Plans PDF Author: Russell H. Plumb
Publisher:
ISBN:
Category : Environmental engineering
Languages : en
Pages : 46

Get Book Here

Book Description
The U.S. Army Corps of Engineers has the mission to conceive and execute civil works projects in the nation's waterways. Projects relating to this mission are subject to various environmental regulations that require the collection of environmental data for project planning, design, construction, and operation. These data-collection processes must be performed under controlled conditions to be legally defensible. An effective quality assurance (QA) plan is needed to meet these requirements. in response to the need for a guidance document to assist Corps personnel with the preparation of QA project plans, a task group met and recommended the preparation of a single standardized approach that would be applicable to all civil works data-collection programs. This guidance report was prepared in response to this recommendation.

Quality Assurance Project Plan/sampling and Analysis Plan for Performing Multi-media Split Sampling During RCRA Facility Investigation/corrective Measures Oversight, Koppers Company, Inc., Denver, Colorado

Quality Assurance Project Plan/sampling and Analysis Plan for Performing Multi-media Split Sampling During RCRA Facility Investigation/corrective Measures Oversight, Koppers Company, Inc., Denver, Colorado PDF Author: Jacobs Engineering Group
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages : 600

Get Book Here

Book Description


RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


EPA Requirements for Quality Assurance Project Plans

EPA Requirements for Quality Assurance Project Plans PDF Author:
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 84

Get Book Here

Book Description


RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-DR-1 Operable Unit, Hanford Site, Richland, Washington

RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-DR-1 Operable Unit, Hanford Site, Richland, Washington PDF Author: United States. Department of Energy
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-NR-1 Operable Unit, Hanford Site, Richland, Washington

RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-NR-1 Operable Unit, Hanford Site, Richland, Washington PDF Author: United States. Department of Energy. Richland Operations Office
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description