An Assessment of Lower Snake River Hydrosystem Alternatives on Survival and Recovery of Snake River Salmonids: Appendix ___to the U.S. Army Corps of Engineers' Lower Snake River Juvenile Salmonid Migration Feasibility Study.

An Assessment of Lower Snake River Hydrosystem Alternatives on Survival and Recovery of Snake River Salmonids: Appendix ___to the U.S. Army Corps of Engineers' Lower Snake River Juvenile Salmonid Migration Feasibility Study. PDF Author: Northwest Fisheries Science Center (U.S.)
Publisher: DIANE Publishing
ISBN: 1428911170
Category : Commercial fishing
Languages : en
Pages : 181

Get Book Here

Book Description


An Assessment of Lower Snake River Hydrosystem Alternatives on Survival and Recovery of Snake River Salmonids

An Assessment of Lower Snake River Hydrosystem Alternatives on Survival and Recovery of Snake River Salmonids PDF Author:
Publisher:
ISBN:
Category : Fishes
Languages : en
Pages :

Get Book Here

Book Description


Columbia River Power System

Columbia River Power System PDF Author: United States. Congress. Senate. Committee on Environment and Public Works. Subcommittee on Fisheries, Wildlife, and Water
Publisher:
ISBN:
Category : Nature
Languages : en
Pages : 368

Get Book Here

Book Description


Contentious Geographies

Contentious Geographies PDF Author: Maxwell T. Boykoff
Publisher: Routledge
ISBN: 1317160487
Category : Science
Languages : en
Pages : 265

Get Book Here

Book Description
The human-environment relationship - intimately intertwined and often contentious - is one of the most pressing concerns of the 21st century. Explored through an array of critical approaches, this book brings together case studies from across the globe to present significant cutting-edge research into political ecologies as they relate to multi-form contestations over environments, resources and livelihoods. Covering a range of issues, such as popular discourses of environmental 'collapse', climate change, water resource struggles, displacement, agro-food landscapes and mapping technologies, this edited volume works to provide a broad and critical understanding of the narratives and policies more subtly shaping and being shaped by underlying environmental conflicts. By exploring the power-laden processes by which environmental knowledge is generated, framed, communicated and interpreted, Contentious Geographies works to reveal how environmental conflicts can be (re)considered and thus (re)opened to enhance efforts to negotiate more sustainable environments and livelihoods.

Lower Snake River Juvenile Salmon Migration Feasibility Report/Environmental Impact Statement. Appendix L: Lower Snake River Mitigation History and Status. Appendix M: Fish and Wildlife Coordination Act Report

Lower Snake River Juvenile Salmon Migration Feasibility Report/Environmental Impact Statement. Appendix L: Lower Snake River Mitigation History and Status. Appendix M: Fish and Wildlife Coordination Act Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 393

Get Book Here

Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of reclamation (BOR) as cooperating agencies, analyzed four alternative to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration) as the recommended plan (preferred alternative) and explains the process for selecting that alternative.

Lower Snake River Juvenile Salmon Migration Feasibility Report

Lower Snake River Juvenile Salmon Migration Feasibility Report PDF Author:
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 900

Get Book Here

Book Description


Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix J

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix J PDF Author:
Publisher:
ISBN: 9781423504931
Category :
Languages : en
Pages : 119

Get Book Here

Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U S Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix D

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix D PDF Author:
Publisher:
ISBN: 9781423504924
Category :
Languages : en
Pages : 409

Get Book Here

Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U S Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project

Lower Snake River Juvenile Salmon Migration Feasibility Report/environmental Impact Statement: Chapters 1-4

Lower Snake River Juvenile Salmon Migration Feasibility Report/environmental Impact Statement: Chapters 1-4 PDF Author:
Publisher:
ISBN:
Category : Chinook salmon
Languages : en
Pages : 60

Get Book Here

Book Description


Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix C

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix C PDF Author:
Publisher:
ISBN: 9781423505198
Category :
Languages : en
Pages : 207

Get Book Here

Book Description
This Final Feasibility Report/Environmental Impact Statement (RE/ElS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower-Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration as the recommended plan (preferred alternative) and explains the process for selecting that alternative.